Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 27, 2023

September 25, 2023

June 1, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Norton Shores, MI

Subscribe to View Full Documents

**As of August 1 2023, the project has not yet been awarded. A timeline for award has not yet been established.** Contract documents may be examined online or at the office of Prein & Newhof, 4910 Stariha Drive, Muskegon, MI 49441 And with the City online or at the office of: City of Norton Shores Department of Public Works 4814 Henry Street, Norton Shores, MI 49441 The work to be performed under this contract will be paid for with State of Michigan Grant funds. All contract payments will be made by City of Norton Shores. Federal prevailing wages Do NOT apply to this project. The Contractor also will be required to comply with the Certificate Regarding Debarment, Suspension, and other Responsibilities Statement included in Appendix A. A bid bond, certified check, or cashier's check payable to City of Norton Shores in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of ninety (90) days after the receipt of bids. Completion date All work shall be substantially completed (water main in service and roads open to traffic) on or before November 30, 2023. Final restoration and project completion shall occur on or before June 1, 2024. See Agreement for specific milestone requirements. The City will award the project in a manner determined to be in the City's best interest. The City reserves the right to reject any and all bids in the City's best interest The project consists of constructing the following: 815 feet of 6-inch and 4,405 feet of 8-inch water main including fittings, hydrants, valves, and water services. City of Norton Shores will provide all water main materials. Contractor must furnish adequate material, equipment, labor, and supervision to complete the specified work, which also includes testing, inspection, and placing the system in operation. All work shall be substantially completed (water main in service and roads open to traffic) on or before November 30, 2023. Final restoration and project completion shall occur on or before June 1, 2024 Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of Contractors obligations under the Contract.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.