Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 1, 2025

February 1, 2028

2100 Main St

Renovation

No Information to Display

$9,918,000.00

Public - State/Provincial

img_map_placeholder

2100 Main St, Stevens Point, WI

Our team is requesting plans for this project.

Subscribe to View Full Documents

As of August 23, 2023, this project is in the conceptual phase. A list of shortlisted firms have been identified, however, an architect has not been selected. Although a firm timeline for construction has not been determined, construction is expected to start in September 2025. *The closed solicitation has been included below for reference: This project will complete preplanning, programming, design, and capital renewal of the Collins Classroom Center (52,334 ASF/89,284 GSF) to transform it from a 1960’s brutalist classroom building to a modern and inviting learning center that offers a flexible building layout and promotes programmatic collaboration. This project will replace the existing, original HVAC system to provide improved air quality and reduce maintenance costs. The existing 4-stop hydraulic passenger elevator will be replaced to address the deteriorating infrastructure and dated technology. This renovation will also address the lack of a fire suppression system and limited ADA accessibility to the building. Departments currently occupying the Collins Classroom Center (CCC) will be strategically relocated across campus, enhancing program alignments. After the renovations are completed, the CCC will become home to the School of Business and Economics, which has reached capacity in its current space in the College of Professional Studies (CPS) building (61,422 ASF/103,533 GSF). Target Project Schedule: Bid Opening: MAY 2025 Start Project: SEP 2025 Substantial Completion: AUG 2027 Project Close Out: FEB 2028

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects