Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 12, 2023

August 21, 2023

No Information to Display

2 Union St

Site Work

No Information to Display

$2,531,524.00

Public - City

img_map_placeholder

2 Union St, Fairhaven, MA

Subscribe to View Full Documents

**As of August 16 2023, project was awarded to Coastal Marine Construction LLC, start date should be next week.** Project scope consists of but is not limited to installation of 193 LF of proposed steel sheet pile bulkhead, associated tie-back anchor systems, and concrete cap with filled steel pipe pile fender system. The project also includes miscellaneous repairs and improvements including but not limited to new concrete float and gangway, adjustments to existing float configurations, timber repairs to existing pier structure, installation of rubber D fenders and all associated site work.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.