Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 30, 2025

July 31, 2027

To Be Determined

New Construction, Site Work

No Information to Display

$90,000,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Delta, BC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Project will include replacement of the existing ninety-two (92) bed Mountain View Manor with a two hundred (200) single bed long-term care home which includes a Day Program for Older Adults (DPOA) for up to 32 clients and a stand-alone Child Daycare Space for up to 49 children, support services areas for food services, housekeeping, linen and laundry services, and washing equipment. Common areas include dining rooms, activity areas for programs, staff offices and support areas, and outdoor covered walkways and gardens. There are also transportation interfaces such as loading facilities, parking for staff, visitors, and HandyDART (the Project). The Project will address deficiencies in the existing facility from both a service delivery and a facility condition perspective. The total area of the Project is estimated to be 15,328 m2. TIMELINE: Request for Proposal to provide consultant services for the project has closed and a preferred proponent has been chosen. The successful Proponent will act in the capacity of a Managing Consultant (Architect) for the Project, including engaging the services of all Sub-Consultants as required to provide complete consulting services for the Project, except that the Authority will engage a professional quantity surveyor and if required geotechnical and environmental consultants. Services to be provided by the Managing Consultant and Sub-Consultants will include: Architectural, Structural, Mechanical, Electrical, Landscape, LEED, Registered Communications Distribution Designer (RCDD), Civil, Code, Acoustic, Building Envelope, Door Hardware, Modular Construction, Building Information Management (BIM) and Mass Timber Hybrid. Further update in early spring 2024. *The Project's construction budget is estimated at an order of magnitude of $90,000,000 (excludes: soft costs, taxes, escalation and contingency).

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.