Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

No Information to Display

Private

img_map_placeholder

Redacted Address, Greenwood, AR

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The project includes replacing the existing two vertical turbine pumps (VTP) with 60 Hp, 1800 rpm nominal VTP. Upgrade incoming 480v open Delta Utility Power Service to 480 wye / 277 volt. Install new main distribution panel and two 60 Hp process pump variable frequency drives (VFDs) A bid bond in the amount of 5% complying with Arkansas regulations shall accompany each bid. All bidders shall comply with requirements of the Arkansas Contrac...

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.