Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2023

October 23, 2023

November 11, 2026

707 Pleasant Ridge Ct

Renovation, Site Work

No Information to Display

$53,000,000.00

Public - City

img_map_placeholder

707 Pleasant Ridge Ct, Mansfield, TX

Subscribe to View Full Documents

Pre-construction and construction services; including, but not limited to: Question Deadline 08/14/2023 Questions regarding the proposal submittal electronically Low pressure micro-filtration membrane system retrofit/expansion using membrane modules by either Nanostone or Pall that are to be provided by a membrane system integrator (Nanostone) or the membrane manufacturer (Pall); Ancillary membrane equipment, including backwash pumps and piping, strainers, crossflow piping (Pall only), air scour blower (Pall only), CIP piping and equipment, feed piping, filtrate piping, tanks, and electrical, instrumentation, and controls; Expansion of the 0.8-percent concentration sodium hypochlorite on-site generation system; Chemical storage, containment, and feed modifications, including improvements for polyaluminum chloride (PACl), liquid ammonium sulfate (LAS), caustic, and 0.8-percent sodium hypochlorite; Replacement of one (1) vertical turbine pump and necessary piping and valves at the Lower Pressure Plane High Service Pump Station; Addition of one (1) vertical turbine pump and necessary piping and valves at the Upper Pressure Plane High Service Pump Station; Modifications to the inlet of Clearwell No. 1; Washwater Recovery Basin 2 modifications, including piping modifications, chemical feed piping, addition of baffles and/or plate settlers, and upsized decant system; Washwater Recycle Pump Station and Recycle Pipeline upsizing; Estimate: $39 to $53 Million Electrical, instrumentation, PLC, and SCADA improvements; Installation of one (1) diesel-powered electrical generator; Addition of automatic transfer switches for three (3) existing diesel powered electrical generators; Yard and plant piping improvements; Structural improvements for the above-mentioned items; and HVAC and architectural modifications (if needed) for the above-mentioned items. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

116 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.