Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 14, 2023

April 1, 2024

No Information to Display

5001 N Columbia Blvd

Site Work

No Information to Display

$2,460,000.00

Public - City

img_map_placeholder

5001 N Columbia Blvd, Portland, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

A recording of the RFQ opening can be found on the Vendor's site. A 36-inch concrete cylinder pipe force main currently conveys wastewater from the Inverness Pump Station to the Columbia Boulevard Wastewater Treatment Plant (CBWTP). A number of failures since 2014 have raised concerns and priority level of this critical asset, particularly because the condition of the majority of the force main alignment is unknown. Using the Progressive Design Build (PDB) delivery method, this project will inspect, design and construct improvements that address deficiencies and reduce the risk of additional failures in the Inverness Force Main system.

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.