Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 26, 2023

August 25, 2023

October 27, 2023

Main St

Paving, Site Work

No Information to Display

$20,000.00

Public - City

img_map_placeholder

Main St, Norway, ME

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of August 16, 2023, this project has not yet been awarded. You can check back after the 18th of August.** The Contractor shall furnish all labor, materials, and equipment necessary for reconstruction of approximately 80 square yards of concrete sidewalk on Main Street in Norway, Maine. The work is generally between Whitman Street and Greenleaf Avenue in 16 different locations. In general, the work includes removing the existing concrete sidewalk sections and installing new concrete sidewalk sections. All work shall conform to the Maine Department of Transportation Specification Section 608- Sidewalks, as applicable to concrete sidewalks. The proposed work shall include the following items: 1. Construction signage and traffic control. 2. Remove existing concrete sidewalk. 3. Grade existing aggregate base prior to placing concrete. 4. Install 4" thick concrete sidewalk with welded steel wire fabric reinforcing. Use Town supplied stamped concrete template in curb locations. 5. Portland cement concrete shall be Class A (4,000 psi concrete). 6. Install cast iron detectable warning plates at 3 locations. 7. Tooled joints and broom finish. 8. All new Portland cement concrete surfaces shall have protective coating applied in accordance with MDOT Specification Section 515.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.