Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

October 9, 2023

February 6, 2024

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Christiansburg, VA

Subscribe to View Full Documents

A. Project Identification Wastewater Treatment Facility Waterline Extension 1. Project Location: Crab Creek Road from Christiansburgs Wastewater Treatment Facility towards Switchback Road. 2. Owner: Town of Christiansburg, ATTN: Michael Kelley - Engineering Director, 100 East Main Street, Christiansburg, VA 24073 B. Engineer Identification: The Contract Documents, dated June 28, 2023 were prepared for this Project by Peed & Bortz, LLC, Civil and Environmental Engineers, 20 Midway Plaza Drive Ste. 100, Christiansburg, VA 24073. C. The Work consists of installation of approximately 1350 l.f. of 8 water main and miscellaneous appurtenances near the Town of Christiansburg Wastewater Treatment Facility. Two wells on the town property will be abandoned as part of this project. D. Additive Alternate #1 Work consists of installation of approximately 1350 l.f. of 2 schedule 40 PVC conduit and miscellaneous appurtenances installed adjacent to the water main trench. Contractor will install the PVC approximately 24 deep along the edge of the water main excavation trench closest to the ROW (outside and south side of the trench) along the water main route. The Project consists of installation of approximately 1,350 linear feet of 8-inch water main and miscellaneous appurtenances near the Town of Christiansburg Wastewater Treatment Facility. Two wells on the town property will be abandoned as part of this project. An additive alternate consists of the of installation of approximately 1,350 linear feet of PVC conduit and miscellaneous appurtenances installed adjacent to the water main trench. Bids will be received for a single prime Contract.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.