Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 16, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, San Diego, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

The purpose of this sources sought notice is to gather information from potential sources to assist in determining the feasibility of the construction services required for the repair of Buildings 1 and 2 metal roof flashing at San Diego Air National Guard Station, and to identify potential sources capable of satisfying the requirement. The purpose of this project is to remove and replace existing counterflashing along the entire length of wall/roof interface, remove all existing old caulk from wall and perma-lock panel along entire length of wall, remove all debris under counterflashing and along entire wall. The estimated cost of this project is between $25,000 and $100,000. Interested parties are requested to submit a brief capability statement that includes the following information: 1. A positive statement of intent to submit an offer as a prime contractor, 2. A completed and signed Sources Sought Information Request Form (see attachment), 3. A listing of projects completed during the past three years, for both government and private industry. The type of project, dollar value, contract number, location, and point of contact should be included. Indicate whether you were a prime or subcontractor and provide the name and point of contact for the prime contractor if you were a subcontractor, and 4. A brief outline of the resources, subcontractors, and key personnel that would be used to accomplish the contract Responses to this sources sought notice are not considered offers and will not be accepted as such. This notice is for market research purposes only and does not constitute a commitment, implied or otherwise, that a solicitation will be issued, nor will the Government pay for information solicited. Respondents will not be notified of the results of this sources sought notice. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Method of Contractor Selection has not been determined at this Time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.