Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

August 30, 2023

October 31, 2024

2301 University Dr

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

2301 University Dr, Bismarck, ND

Subscribe to View Full Documents

The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract The Disadvantaged Business Enterprise (DBE) goal for this project is 4.18%. General asphalt rehabilitation of various airfield pavements including crack sealing, large erapavement markings. Each bid shall be accompanied by a separate envelope contairpercent (5%) of the maximum bid price, executed by the Bidder as principal and by a surety company auth North Dakota, payable to the City of Bismarck, conditioned that if the principals bid be accepted and the <(10) days after Notice of Award has been executed, will execute and effect a contract in accordance with if bond as required by law and regulations and determinations of the governing board. Any bid not containing this document shall not be acceptable and shall be returned to the Biddeto furnish a Contract Performance Bond and Payment Bond in the full amount of the Contract. The goals and timetables for minority and female participation, expressed in percentagiworkforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for n0.4% Goals for female participation in each trade: 6.9% These goals are applicable to all of the Contractor :Federal or federally assisted) performed in the covered area. If the Contractor performs construction work

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.