Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2023

August 28, 2023

December 1, 2023

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Brighton, ON

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Municipality of Brighton (Municipality) wishes to engage the services of a qualified and experienced Contractor for the supply of all necessary materials, services, and equipment to complete Sanitary Sewer Flushing, Cleaning, CCTV and Trenchless Rehabilitation of their collection system including Maintenance Holes. The Municipality will consider a variety of repair methods (CIPP, Grouting, PVC Lining, etc.) but bidders must provide detailed information on the materials and methodologies as well as documented proof of project implementation and related references. The intent of this project is to identify and repair structural and infiltration and inflow (I&I) deficiencies to reduce hydraulic loads, improve system condition, and reduce risk of failure in sections of the Urban Sanitary Sewer Collection System. It is estimated that this program will require approximately 5,000 meters of flushing and CCTV work and an estimated 500 metres of lining of selected lengths of main, including isolated joint and connection repairs, as well as the sealing of associated manholes. Contractors should note that the actual length of pipe lined/repaired may vary considerably, depending on the extent of repairs identified during flushing and CCTV inspection. A running total of inspection and repair costs will be tracked to ensure expenditures do not exceed the current budget for this program which is approximately $280,000. The successful Contractor will be required to work closely with Environmental Services Staff to identify the location and type of repairs as well as track expenditures. The Contractor must also provide a digital report to the satisfaction of the Municipality (including CCTV Video Records), documenting the structures and sections of pipe inspected, general condition of the infrastructure, type and location of issues and repairs completed, and recommendations for future/additional work. Documents can be obtained at: https://brighton.bidsandtenders.ca Question Deadline: Thu Jul 13, 2023 2:00 PM (EDT) Award value is undisclosed

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.