Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

November 6, 2023

February 19, 2025

30 N Dubuque St

Renovation

No Information to Display

$4,907,200.00

Public - State/Provincial

img_map_placeholder

30 N Dubuque St, Iowa City, IA

Subscribe to View Full Documents

VAN ALLEN HALL - RENOVATE THE WESTERN SEVENTH FLOOR The certified Iowa TSB participation goal for this project is 10 percent (10%) of the Base Bid Project consists of major renovation of the western half of the seventh floor in Van Allen Hall. Work includes selective demolition of walls, finishes, mechanical and electrical systems. New work includes new walls, ceilings, doors, finishes, casework, mechanical, electrical, fire suppression, fire alarm, telecommunications and access control systems. Scope also includes replacement of exterior windows for the project area and lightning protection for the entire building The scope of this project includes the renovation of the western half of Level 7 of existing Van Allen Hall to create shared laboratory spaces for the Physics and Astronomy Department. Work will include replacement of exterior windows, in addition to demolition and installation of interior partitions, ceilings, doors, and finish flooring. Mechanical systems will be upgraded, including a dedicated AHU to support the labs and cleanroom spaces. Electrical power, telecom, lighting, door access control, and fire alarm systems will be updated to serve new spaces. This project will install a new lightning protection system with additional grounding. Van Allen Hall is not fully sprinklered. This project will include the installation of a pre-action sprinkler system for the western half of Level 7 only. Project scope includes conversion of existing Mens Restroom 721 on the west half of Level 7 to a single-user, ADA accessible restroom. Currently, there are no ADA accessible restrooms on Level 7. The new single-user restroom will also improve the ratio of mens and womens restrooms on this floor

81 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects