Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

May 16, 2024

December 31, 2026

I-5

Paving, Site Work

No Information to Display

$170,000,000.00

Public - State/Provincial

img_map_placeholder

I-5, Des Moines, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Project replaces the existing Cement Concrete Pavement (CCP), Hot Mix Asphalt (HMA) pavement, bridge deck overlay pavements, and bridge expansion joints on Interstate 5 (I-5), from Yesler Way to north end of Ship Canal Bridge. In addition, the Project rehabilitates the existing pavements of select I-5 on- and off-ramps by planing and paving with HMA pavement. A federally funded contract with a 16% Disadvantaged Business Enterprise goal for the construction portion and a 20% Disadvantaged Business Enterprise goal for the design portion. County : King County Estimated value $130,000,000 - $170,000,000 Kyengo Ndile NWR Sno-King Design Office - Project Engineer projxl6272@wsdot.wa.gov (206) 440-4272 WADOT - I-5 Yesler Way to Northgate Way Vic. Pavement, Deck, Joints, and Drainage *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. We will rehabilitate I-5 between Yesler Way and Northgate Vicinity. The Project replaces select full and partial cement concrete pavement (CCP) panels, bridge deck overlay pavements, bridge expansion joints, stormwater drainage rehabilitation. In addition, the Project rehabilitates the existing pavements of select I-5 on- and off-ramps by planing and paving with HMA pavement. Deadline for Submitting RFQ Questions

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.