Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 7, 2026

November 1, 2023

January 10, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Woodland, WA

Subscribe to View Full Documents

Project consists of cleaning of the existing City of Woodland Ranney Well lateral well screens 2, 3B, 4B, and Alignments 1, 2, and 3, including pre- and post-maintenance pumping tests, and closed-circuit television inspection. Technical specification section describing the work required of the Contractor and timing for completion of the work and additional information regarding the project can be found on the city. The following project will be accomplished as a SMALL WORKS PROJECT and will be subject to prevailing wage laws. Contact Ryan Walters, P.E., Consulting City Engineer, at (360) 425-0991 for questions or to arrange a site visit. The Contractor shall include Washington State Retail Sales Taxes on the full contract price. All construction and material, unless otherwise specified, shall be in accordance with the most current Standard Specifications and Standard Plans for Road, Bridge and Municipal Construction as prepared by the Washington State Department of Transportation and as amended under Amendments to the Standard Specifications, and the American Public Works Association, and the City of Woodland Engineering Standards for Construction. Work shall begin between November 2023 and February 2024 and shall be completed within forty x (40) working days (substantial completion) and fifty (50) working days (physical completion) after receipt of permission to proceed. Work shall be completed within the time stated above, exceeding this timeframe shall incur liquidated damages of $1,000/day. State Sales Taxes -- the provisions of Section 1-07.2(2) -Rule 170 - apply to this project. The Contractor shall include Washington State Retail Sales Taxes on the full contract price. All construction and material, unless otherwise specified, shall be in accordance with the most current Standard Specifications and Standard Plans for Road, Bridge and Municipal Construction as prepared by the Washington State Department of Transportation and as amended under Amendments to the Standard Specifications, and the American Public Works Association, and the City of Woodland Engineering Standards for Construction. The CITY OF WOODLAND reserves the right to cancel this request or reject any and all bids received or to waive any minor formalities of this call if in the judgment of the City Council the best interest of the City would be served.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.