Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

February 22, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, San Rafael, CA

Subscribe to View Full Documents

The project work is generally described as: a) Installation of two (2) 60-diameter precast concrete Cleanout Access Structures for a 20 O.D. HDPE force main. b) Installation of eight (8) 60-diameter precast concrete CCTV Inspection Access Structures on a 20 O.D. HDPE force main. c) Bypass pumping, pipeline pigging, potholing, traffic control, and other ancillary components as necessary. 6. All the project work shall be completed in accordance with the bid packages on file at the District. Complete bid packages may be obtained at the Engineering Department, Las Gallinas Valley Sanitary District, 101 Lucas Valley Road, Suite 300, San Rafael, California 94903. There will be a fifty dollar ($50) non-refundable charge for each bid package. Checks and money orders must be made payable to the Las Gallinas Valley Sanitary District. Requests for information on receiving bid packages should be directed to the District Offices at (415) 472-1734. Bid packages will be mailed upon request and receipt of the non-refundable charge and the bidders UPS or FedEx account number. The Contractor shall remove equipment, piping,and concrete work as necessary for theconstruction of work as shown on the plans and as specified. All materials removed not claimedby the District shall be disposed of at a legal disposal sit Cleaning and disposal shall comply with local ordinances and pollution controllaws. Do not burn or bury rubbish or waste materials on the project site. Do notdispose of volatile wastes such as mineral spirits, oil, chemicals, or paint thinnerin storm or sanitary drains. Disposal of wastes into streamsor waterways isprohibited. Provide acceptable containers for collection and disposal of wastematerials, debris, and rubbis The Engineer'sestimateis $500,000.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.