Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 25, 2023

November 26, 2024

Dietz Mountain Rd

Demolition, New Construction, Paving, Site Work

No Information to Display

$2,500,000.00

Public - State/Provincial

img_map_placeholder

Dietz Mountain Rd, Monroe Township, PA

Subscribe to View Full Documents

For the Improvement of a Certain Section of Township Route 337 (Dietz Mountain Road), Sec Brg in Wyoming County, Monroe Township. The Location of the Project is as Follows: From the Intersection With Sr 0309 (Sta 20+00) to a Point Approximately 3.5 Miles South From Sr 0292 (Sta 25+25) Along T-337, With a Total Work Area Length of 425 Feet (0.080 Miles). The Project Involves the Replacement of an Existing Structure Carrying T-337 Over Leonard Creek. The Existing Structure is a Single Span Steel Thru Girder/floorbeam/stringer Bridge. The Proposed Structure Will Be a Single Span Prestressed Concrete Pa Bulb-tee Beam Bridge Founded on Integral Abutments. Other Work Includes Minor Roadway Approach Reconstruction, Shoulder Widening and Restoration, Guiderail Replacement, E&s Control Measures, Drainage, Temporary Traffic Control, Signing, Pavement Marking, Structure Removal, Minor Roadway Work on Sr 0309, and Other Miscellaneous Construction Work. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 53.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - T-337 Dietz Mountain Road over Leonard Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects