Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

October 1, 2024

No Information to Display

264 Airport Rd

Renovation

No Information to Display

$1,000,000.00

Public - County

img_map_placeholder

264 Airport Rd, Maple, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The County of Currituck, North Carolina (County) requests Statements of Qualifications (SOQ) for the services of a Design-Builder (DB and/or Proposer) for the renovation of the county fuel facility (Project) Each Proposer having requested the full RFQ package will be provided a link to a OneDrive folder no later than 2:00 p.m. on Thursday, July 20, 2023. It is the sole responsibility of the Proposer to ensure receipt of its Statement of Qualifications to the County. Confirmation of receipt by telephone can be made directly to Crystal Owens at 252-232-6000, ext. 4020. The County reserves the right to negotiate with any and/or all Proposers that submit qualifications. The County further reserves the right to reject all offers or award a contract which, in its judgment, is in the best interest of Currituck County. The County reserves the right to waive any informality. The County does not discriminate on the basis of race, color, national origin, sex, religion, age, disability, sexual orientation, or genetic information in employment or the provision of or contracting for goods or services. The County is an equal opportunity employer and encourages Small Business Entities, Women Owned Businesses and Minority Owned Businesses to submit qualifications. The Fuel Facility is located at 264 Airport Road, Maple, North Carolina. The County requests qualifications from design-build teams for the design, permitting and renovation of the county fuel facility. The anticipated project budget is approximately one million dollars ($1,000,000). Deadline for submittal of questions 07/13/2023, 4:00 p.m. EST Notice to Proceed for Design 10/01/2023 The County reserves the right to adjust the schedule and add or remove specific activities to meet the unique needs of this Project. Selection Criteria and Weighting of Qualifications Statements of Qualifications will be evaluated based on Proposers responses to the requirements of this RFQ. Evaluations will focus on relative strengths, weaknesses, and deficiencies associated with the SOQ. Each Proposer will be evaluated and shortlisted based on their SOQ score (100 points maximum) as determined through a qualification review process scoring criteria noted below: Section 1: DB Team (15 Total Points -detailed breakdown of points shown below) 1.1 DB Team Selection (5 Points) 1.2 Profile of Each Firm on DB Team (5 Points) 1.3 Profile of Key Personnel (5 Points) Section 2: Experience (50 Total Points) Section 3: Project Approach (35 Total Points) Interviews with the short-listed teams may be held at the option of the evaluation committee. The County reserves the right to obtain clarification or additional information with any proposer regarding its SOQ. All proposers will be notified of the selection results. Final recommendation of any selected proposer is subject to the approval of County officials. The County reserves the sole right to select the most qualified proposer(s) deemed to be in the best interest of the County. Project Team Selection: Each design-builder shall submit in its response to this Request for Qualifications an explanation of its project team selection, which shall consist of either of the following: a. A list of the licensed contractors, licensed subcontractors, and licensed design professionals whom the design-builder proposes to use for the projects design and construction; or b. An outline of the strategy the design-builder plans to use for open contractor and subcontractor selection based upon the provisions of Article 8 of Chapter 143 of the General Statutes. By submitting an SOQ, the Proposer certifies to the County that each licensed design professional who is a member of the DB team, including subconsultants, was selected based upon demonstrated competence and qualifications in the manner provided in N.C. Gen. Stat. 143-64.31.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.