Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 7, 2023

No Information to Display

County Hwy 73

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

County Hwy 73, Evergreen, CO

Subscribe to View Full Documents

Reference Number 0000324518 This is a roadway project on JC-73, from Buffalo Park Road to Plettner Lane. The Contractor shall make improvements to the intersection of Buffalo Park Road. This includes the installation of new traffic signal poles and improvements to the turn lanes and pedestrian crossings. The Contractor shall make modifications to the existing structure at Buffalo Park Road and the existing structure on JC-73 near Plettner Lane. The Contractor shall install new structures at Little Cub Creek Road and at a private driveway crossing. The Contractor shall install a cast-in-place retaining wall, which is necessary for the installation of roadway widening, bike lanes, curb & gutter, and sidewalk. The Contractor shall install and manage any dewatering or creek diversion necessary for the construction of the retaining walls or structures. The Contractor shall complete the construction of off-street parking lots, storm sewer improvements, and a water quality basin. The Contractor shall coordinate with all utilities and construct the necessary water and sanitary adjustments. The Contractor shall mill, overlay, and restripe JC-73 prior to finishing the project. The project work consists of the installation and maintenance of the necessary erosion control measures and revegetation of the site. The Contractor shall coordinate with utility companies on the relocation of utilities throughout the project. The Contractor is responsible for all necessary traffic control measures during construction and for reducing and minimizing the impacts to traffic. The Contractor to coordinate any impacts with Jeffco Schools, Evergreen Fire Rescue, Jeffco Sheriffs Office, and other local stakeholders. Question Acceptance Deadline 07/27/2023 11:00 AM MDT Questions are submitted online No Participation Requirements - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Federally Funded - Insurance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 %

83 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.