Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 27, 2023

August 28, 2023

October 20, 2023

402 W Liberty Dr

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

402 W Liberty Dr, Wheaton, IL

Subscribe to View Full Documents

The City of Wheaton is requesting construction services for improving the electrical system at Liberty Square in Downtown Wheaton. Liberty Square is a 1/3-acre park on the northwest corner of West Liberty Dr and West St. The park is on the south side of the Downtown Wheaton Metra Train Station, and on the north side of a PACE bus stop on Liberty Dr. The project involves upgrading the existing electrical service to feed the existing loads for a traffic signal and lighting and adding loads for new receptacle pedestals. The work will involve replacing an old controller cabinet with a new controller cabinet, connecting a new electrical service, and installing a site electrical power distribution system that includes conduit layout, hand-holes, and 14 receptacle pedestals. The City reserves the right to modify the estimates, or remove them in their entirety, whichever is in the best interests of the City. When specifically requested by the City, Bidder shall provide a Bid Bond / Bid Deposit of 10% of the full Contract price.Maintenance Bond IS Required. The successful Bidder shall be required to furnish a Maintenance Bond equal to ten percent (10%) When specifically requested by City in Exhibit A, Contractor shall furnish with the executed Agreement, performance and payment bonds equal to one-hundred and ten percent (100%) of the full contract price, on forms approved by the City, as security for the faithful performance and completion of all the Contractor's obligations under the Contract Documents, including, but not limited to Contractors Prevailing Wage Act obligations under this Agreement, and covering the payment of aII materials used in the performance of this Agreement and for all labor and services performed under this Agreement. Question Deadline 07/21/2023 at 11:00 AM CT All questions, either administrative or technical, shall be submitted via email to Tina Walters at twalters@wheaton.il.us

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects