Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

August 14, 2023

August 15, 2023

439 W Utah Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

439 W Utah Ave, Payson, UT

Subscribe to View Full Documents

Furnish all labor, equipment and materials required to remove asphalt pavement, install asphalt and concrete pavement, and parking lot striping. All work to be done according to plans, Payson City, and APWA Standards and Specifications. Payson City Corporation reserves the right to accept or reject any or all proposals, or any part of any proposal, including the right to waive informalities in any part of any proposal within the best interest for Payson City. As part of the bid, submit a bid bond in the amount of 5% of the total bid. CONTRACT AWARD A. The City awards the contract to the lowest responsive and responsible bidder within 30 calendar days. B. The City may withhold award beyond the 30 calendar days with the approval of the successful bidder. C. The bidder may withdraw the proposal without liability if the award is not made within 30 calendar days. D. The City notifies the successful bidder by letter mailed to the address shown on the proposal that the bid has been accepted and the contract has been awarded. Payment Bond secures the payment of the claims of laborers, mechanics or material person employed on the work under the contract. Performance Bond guarantees the faithful performance of the contract Submit bonds equal to 100 percent of the contract amount. Question Deadline 07/12/2023 at 6:00 PM All questions MUST be asked on the U3P site. The Contractor is responsible for getting all the updates on U3P before bidding the project. Procure drawings on the U3P site. All updates, including addendums and answers to inquiries will be made on U3P. All questions MUST be asked on the U3P site. The Contractor is responsible for getting all the updates on U3P before bidding the project. Payson City Corporation reserves the right to accept or reject any or all proposals, or any part of any proposal, including the right to waive informalities in any part of any proposal within the best interest for Payson City.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects