Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2023

August 21, 2023

September 30, 2023

100 5th St NE

Site Work

No Information to Display

$54,807.00

Public - City

img_map_placeholder

100 5th St NE, High River, AB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The contractor is responsible to manufacture, deliver and install one (1) columbarium in 2024 and another one (1) columbarium at such time as the first columbarium is more than 75% sold, and another one (1) columbarium at such time as the second columbarium is more than 75% sold, for a total of three (3) columbaria in total. All columbaria will be the same style and are to match the existing Spruce Columbarium that is existing in the Highwood Cemetery at 100 5th St NE, High River, Alberta.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.