Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 2, 2023
November 1, 2023
June 30, 2024
12750 Interstate 80
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - State/Provincial
12750 Interstate 80, Truckee, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The California Department of Food and Agriculture needs a contractor to remove and dispose of door motors, and then replace with new door motors. The overhead door motors for the Truckee Border Protection Station have been damaged due to wear and tear and need to be replaced. Nineteen (19) door motors will be removed and disposed of, and nineteen (19) new door motors, modified to work in damp outdoor environments, will be installed in place. Contractor Responsibilities General Provisions: 1. The Contractor shall obtain permits and/or licenses necessary to comply with all laws, codes, and regulations applicable to performing this scope of work. 2. The Contractor shall obtain approval from the station manager before beginning work. 3. The Contractor shall furnish all materials, labor, and equipment necessary to complete the scope of work. 4. All work shall be performed under favorable weather and temperature conditions as per material label instructions. 5. The Contractor shall take all reasonable measures to protect State and/or private properties from any damage. 6. The Contractor must obtain prior approval from the Station Manager if services might cause an interruption in the routine operations of the facility. 7. The Contractor shall provide a guarantee of work from the date of completion, for all work related to this contract. Contractor shall: 1. Remove and dispose of nineteen (19) overhead doors motors currently installed.2. Install nineteen (19) new Liftmaster CGH501L5 Gearhead Chain Hoist Heavy Duty High Cycle Commercial Industrial Operators with Standard Sensor Eyes, 115V, with damp environment modification and cord reel. CDFA Responsibilities: CDFA Shall: 1. Keep work area around overhead doors clear of traffic and accessible to the contractor Post Job Approval 1. All work shall be subject to approval of Station Manager. 2. The Contractor shall repair anything that is determined to be unsatisfactory by the Station Manager at no additional cost. Cost Proposal Contractor shall include the cost of providing rights under Labor Code, Unemployment Insurance Code, and Industrial Welfare Commission Order in their proposed budgets. The term of this contract is November 1, 2023, or upon final/Department of General Services/Office of Legal Services (DGS/OLS) approval, whichever is later, through June 30, 2024. Written questions must be received by 12:00 PM PT:July 19, 2023 Post Questions and Answers by 5:00 PM PT: July 26, 2023 To maintain fairness during the bidding process, all questions must be submitted in writing and sent to the Grants and Contracts Unit email (grantsandcontractsunit@cdfa.ca.gov) only. The subject line of the email must contain the Bid Number. Bidders must not contact any program staff during the bidding process as this could result in disqualification. Answers to questions received prior to the submission deadline listed above, will be provided via a formal addendum and will be posted electronically In the event a potential prime contractor is unable to attend the mandatory walk-through, an authorized representative may attend on their behalf. The representative may only sign-in for one (1) company. Subcontractors may not represent a potential prime contractor at a pre-bid conference or walk-through. If this walk-through is mandatory, no bid will be accepted unless the bidder or their authorized representative was in attendance. Bidders must email the address listed on the cover page of this IFB no later than five working days prior to the scheduled date and time of the pre-bid conference/walk-through to arrange for a reasonable accommodation for those who need assistance for the walk-through due to physical impairment.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Truckee, CA
Bid Date: Aug 02 2023
Truckee, CA
Bid Date: Mar 30 2023
Truckee, CA
Bid Date: Nov 03 2023
Truckee, CA
Bid Date: Apr 06 2022
Truckee, CA
Bid Date: Dec 15 2022
Truckee, CA
Bid Date: Apr 20 2021
Truckee, CA
Bid Date: May 26 2022
Truckee, CA
Bid Date: Aug 10 2023
Truckee, CA
Bid Date: Aug 15 2023
Glendale, CA
Bid Date: Aug 02 2023
Glendale, CA
Bid Date: Aug 02 2023
Fresno, CA
Bid Date: Aug 09 2023
Burlingame, CA
Bid Date: Aug 02 2023
San Diego, CA
Bid Date: Aug 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
