Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 14, 2023

August 7, 2023

January 4, 2024

396 Old Frankstown Rd

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

396 Old Frankstown Rd, Monroeville, PA

Subscribe to View Full Documents

Boyce Park Water Storage Tank Chlorine Residual Control System Project Cost Estimate: Contract Number 2023-4 -General/Mechanical = $650,000 Contract Number 2023-5 - Electrical = $100,000 Contract Number 2023-6- HVAC = $50,000 Bids will be accepted only from Bidders who have obtained official sets of Bidding Documents from Bankson Engineers, Inc. and who are on Bankson Engineers, Inc.s list of planholders. The Bid Proposals must be a paper copy, with an original signature, submitted in an envelope along with the original bid security, all as described in the Instructions to Bidders. Each proposal shall be accompanied by a certified check, cashier's check, or bidder's bond in favor of Monroeville Municipal Authority in the amount of not less than ten percent (10%) of the amount of the proposal. This project is subject to the provisions of the Pennsylvania Prevailing Wage Act. Workers must be paid not less than the prevailing minimum wages as established by the Pennsylvania Department of Labor and Industry, as shown on the applicable schedule. No bid may be withdrawn for a period of sixty (60) days after the scheduled closing time for the receipt of bids. The Authority reserves the right to reject any and all bids and to waive any informality in bids received. Furnish and install new electrical service, including ductbanks, conduit, wiring, etc. 2) All building and tank powervent power distribution, lighting, switches, receptacles, grounding, conduits, wire, etc Furnish and install new electrical service, including ductbanks, conduit, wiring, etc. 2) All building and tank powervent power distribution, lighting, switches, receptacles, grounding, conduits, wire, etc All questions about the meaning or intent ofthe Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Bid Result HVAC McRANDAL COMPANY INC-$56,595 GENERAL/MECHANICAL SE CONSTRUCTION Group-$879,000 ELECTRICAL WAGNER ELECTRIC AND CONSTRUCTION-$207,000

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.