Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Greenwood, SC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The work consists of installing approximately 2,576 feet of new 60-inch gravity trunk sewer and 320 feet of new 8-inch gravity connector sewers; installing approximately 11 new precast concrete manholes; crossing one road via bore-and-jack; crossing two roads via open cut; traffic control and pavement restoration as required; lowering the existing grade along a portion of the proposed trunk sewer; installing soil and erosion control devices; performing complete restoration as required; performing bypass pumping as necessary; and performing all other miscellaneous work required to complete the Project. This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP). All federal SCIIP requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM). Bidders must comply with Title VI if the Civil Rights Act of 1964, The Fair Housing Act, Title III of the Civil Rights Act of 1968, Section 504 of the Rehabilitation Act of 1973, the Age Discrimination Act of 1975, Title II of the Americans with Disabilities Act of 1990, the Contract Work Hours and Safety Standards Act, the Clean Air Act, the Federal Water Pollution Control Act, the Copeland Anti-Kickback Act, and all other requirements as described in the SCIIP SPECIAL PROVISIONS. Each bid must be accompanied by a certified check of the Bidder or by a Bid Bond made payable to the Owner, for an amount equal to not less than five percent (5%) of the total bid as a guarantee that, if the bid is accepted, the required Agreement will be executed and that a one hundred percent (100%) Performance Bond and one hundred percent (100%) Payment Bond will be furnished. The Owner reserves the right to waive any informalities in bidding and to reject any or all Bids if it is in the Owners best interest to do so.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.