Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

August 7, 2023

August 6, 2024

1425 Fort St

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

1425 Fort St, Buffalo, WY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

General (a) The Bureau of Land Management (BLM) is seeking quotations for construction services as attached in the accompanying statement of work. The BLM intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13. A single contract award will be made to the Offeror whose quotation represents the lowest price technically acceptable. The offeror's submission must demonstrate the ability to satisfy all technical requirements set forth in this RFQ. (b) The Government will not award any contract if the resulting contract would not represent a "best value" to the Government. (c) To assure timely and equitable evaluation of quotations, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete quotation. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to adhere to quotation requirements, at the time of submission, may result in the quotation being unacceptable to the Government and eliminated from consideration for award. It is the responsibility of offerors to ensure their quote is received by the recipient and by the due date and time. (d) Offerors are cautioned to submit adequate information to enable the Government to fully ascertain each offeror's capability to perform the requirements in accordance with the requirements of the request for quotation (RFQ). (e) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the Contracting Officer in writing (email is the preferred method) with supporting rationale by the question deadline specified on the cover page of this document. (f) This RFQ does not commit the Government to any costs incurred in the preparation and submission of a quote or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFQ does not constitute an award commitment on the part of the Government. (g) Quotation must be valid for a minimum of 60 days. (h) Respondents must complete registration utilizing the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/. The Government will obtain respondent representations and certifications through this system. (i) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate. (j) All questions should be emailed directly to the Contracting Officer by the posted due date. Only written RFI's will be considered and responded to by the Government. BLM responses to RFIs will be posted as an amendment to the solicitation. Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions Due Date: July 17, 2023 at 2:00 pm Local Mountain Time All questions should be emailed directly to the Contracting Officer by the posted due date. Only written RFI's will be considered and responded to by the Government. BLM responses to RFIs will be posted as an amendment to the solicitation. Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.