Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 11, 2023
September 11, 2023
December 10, 2023
13568 Rd 26 1/2
Demolition, Site Work
No Information to Display
$104,177.00
Public - City
13568 Rd 26 1/2, Madera, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor's failure to comply with this obligation, and the Contractor shall not be excused with respect to any failure to so comply by act or omission of the Construction Manager, Architect, Engineer, Inspector, Division of the State Architect, or representative of an of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and the Contractor protests, in accordance with the Contract Documents that the act or omission is preventing the Contractor from fully complying with the Contract Documents **As of July 24, 2023, bids were rejected. No definite date for the rebid.** Bids shall be accompanied by a certified check, cashier's check , or bidders bond in an amount not less than ten (10%) percent of the total bids made payable to MUSD. The substitution of appropriate securities in lieu of retention amounts from progress payments in accordance with public Contract Code Section 22300 is permitted. To the extent required by Public Contract Code Section 20103.7, the District shall also make the Contract Documents available for review at one or more. Pursuant to the provisions of Section 1770 et seq of the California Labor Code, each worker of the contractor and any of its subcontractors engaged in work on the Project shall be paid not less than the prevailing wage rate. SB 854 established new public works contractor registration program requirements for all public works projects. Pursuant to Labor Code Section 1725.5; Starting March 1st, 2015 no contractor/subcontractor may be listed in a bid proposal unless registered with the Department of Industrial Relations (DIR). Starting April 1st, 2015 no contractor/subcontractor may be awarded a contract, nor employed on a Public Works project unless registered with the DIR. This project is subject to prevailing wage requirements and compliance monitoring and enforcement by the DIR and may at any time require contractors/subcontractors to upload electronic certified payroll records on the DIR website. Bidders shall be required to have a valid class "B or C21" Contractor's License. Refer questions to Susan Harautuneian via email @ susanharautuneian@maderausd.org no later than July 12, 2023 @ 10:00:00 am. Only questions received via email will be responded to. Removal and disposal of asbestos in accordance with State of California Asbestos Abatement Specifications, San Joaquin Valley Air Pollution Control District, and the federal Clean Air Act (and all implementing regulations) o Demolition and removal of building, basements, concrete/asphalt slabs, and foundations. o Demolition and removal of site improvements, including but not limited to foundation, parking asphalt, water fall retaining wall, septic tank, concrete patio, in-ground swimming pool and concrete sundeck. Below grade structures, foundation and basement slab shall be totally removed. Remove all vegetation around both buildings with the exception of large trees. Remove all fencing and fence posts. o Filling of the demolition site with clean lead-free soil, to meet existing site grades, in 6" lifts, compacted as necessary to stabilize the material and eliminate excessive settling. o Remove air-conditioning equipment without releasing refrigerants. o Dust shall be suppressed by a continuous water spray during demolition. o All salvage materials resulting from work under this contract and located within the specified areas will become the property of the contractor. o Wells, well pumps and water storage tanks are to remain. o This Project shall be Prevailing Wage
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Madera, CA
Bid Date: Sep 01 2023
Madera, CA
Bid Date: Sep 12 2023
Madera, CA
Bid Date: Oct 27 2023
Madera, CA
Bid Date: Oct 31 2023
Madera, CA
Bid Date: Aug 31 2023
Madera, CA
Bid Date: Dec 14 2023
Madera, CA
Bid Date: Nov 14 2023
Madera, CA
Bid Date: Oct 18 2023
Madera, CA
Bid Date: Aug 22 2023
Madera, CA
Bid Date: Aug 08 2023
Sacramento, CA
--
West Hollywood, CA
--
La Puente, CA
Bid Date: Aug 04 2023
Lompoc, CA
Bid Date: Mar 01 2023
South El Monte, CA
Bid Date: Jun 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
