Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

October 9, 2023

December 14, 2024

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, San Antonio, TX

Subscribe to View Full Documents

2024 TOC for Flatwork and Street Improvement Package 1 will be used to place flatwork Task Orders to complete IMP sidewalk projects from the council approved FY24 IMP lists, from the FY24 NAMP program, and to support remote ramp construction for the FY24 SMP micro surface projects. The likely elements of flatwork construction for IMP sidewalk and NAMP projects include placement of new sidewalks (with or without removal of existing), placement of new driveway approaches which are not ADA-complaint (with removal of old), and restoration of the sites with backfill/topsoil/sod. Ancillary activities (that are required to produce a complete and usable project) may include replacement of existing curb, removal and replacement of mailboxes, removal of trees, and maintenance of existing area signs (upgrade of poles/remove & replace, etc), and placement of back-curb or retaining wall. Minimal asphalt activities include curb patch and small areas of asphalt improvement necessary to place curb/sidewalk. Remote ramp placement/upgrade is a stand-alone, all inclusive item that is used to support pavement projects where the ADA ramp is required to be placed/restored. It is understood and agreed that the work is to be substantially completed on or before 420 calendar days. This project does not include hazardous environmental work. This project requires 12 project sign(s). The Deadline for questions is scheduled for Thursday, July 20, 2023 at 4:00 P.M. CT. CoSA Base Bid: $4,995.575.59 SAWS Water Base: $253,890.00 SAWS Sewer Base: $10,405.00

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.