Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

May 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Guyton, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This project consists of various repairs and enhancements to fourteen (14) existing Effingham County roads, including Gracen Road, Saddleclub Way in the Belmont Glen Subdivision, Silver Hill Church Road, Old Augusta Road, Archer Road and others. DEADLINE FOR QUESTIONS: July 21, 2023 This project consists of various repairs and enhancements to fourteen (14) existing Effingham County roads, including Gracen Road, Saddleclub Way in the Belmont Glen Subdivision, Silver Hill Church Road, Old Augusta Road, Archer Road and others. DESCRIPTION OF WORK: The Effingham County roads to be resurfaced within this Project shall include the following: Archer Road, from the intersection of Highway 119 to the intersection with Brittingham Road (approximately 1.03 miles long, twenty (20) foot final road surface width). Existing road surface will be leveled and overlaid with Asphalt (9.5mm @ 135# per SY). Centerline striping to match existing. Gracen Road, from the intersection with Old Louisville Road to the intersection with Highway 17 (approximately 1.66 miles long, twenty-one (21) to twenty- three (23) foot reclaimed base width, twenty (20) to twenty- two (22) foot final road surface width). Existing road surface and base will be reclaimed to a depth of eight (8) inches and blended on- site with Portland Cement (approximately 45# per SY). Reclaimed base will be overlaid with Asphalt (12.5mm @ 220# per SY). Edge and Centerline striping to match existing.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.