Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

November 13, 2023

Red Hill Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Red Hill Ave, Tustin, CA

Subscribe to View Full Documents

This work shall consist in part of furnishing all labor, materials, tools, equipment and incidentals as required by the plans, specifications and contract documents for the above stated project. The work to be done hereunder consists of removal and deep lift repairs of asphalt concrete pavement failure areas, cold plane of existing asphalt, asphalt rubber hot mix (ARHM) overlay, repair of damaged sidewalk and curb & gutter, reconstruction of non-conforming curb ramps, replacement of traffic signal detector loops, replacement of traffic signing and striping, adjustment of manholes/valve covers to grade, and installation of a pedestrian activated traffic control device on Red Hill Avenue between San Juan Street and Melvin Way all as detailed on the plans and specified herein or as customarily necessary to complete the intent of the proposed work. Liquidated Damages: $ 1,000 per day Question Deadline 08/04/2023 at 5:00 PM PT If the answer to question 8.4 was yes, explain the circumtances in the space provided Engineers Estimate: $ 1,500,000 to 1,550,000 Project Schedule (contract days): 60 working days Cashier s check or certified check, payable to the order of the City of Tustin, of not less ten percent (10%) of the bid or a bond in said amount, payable to the City of Tustin and signed by the bidder as well as a corporate surety, shall accompany the bid *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects