Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Sloughhouse, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Erosion Control Services DWMR is seeking a firm that is experienced in the hydroseed application of seed mixes for erosion control purposes. The scope of work under this agreement will consist of: A. Preparation: Annually, prior to notification by DWMR that hydroseeding services are needed, the erosion control firm project manager shall perform a site walk with the DWMR Project Manager to review the areas requiring erosion control and discuss any surface preparation and/or soil amendment that may be appropriate for certain problem area. The erosion control firm shall procure seed, fertilizer, fiber, tackifier, and any other material components of the hydroseeding mix so as to be on-hand prior to notice to proceed with work. B. Submittals: All material components of the hydroseeding mix shall be documented through the submittal process. Provide material information sheets identifying manufacturer, material type or model, material properties, dates of manufacturing, and any applicable certificates of compliance. C. Coordination: Following notification of hydroseeding services needed at KLF, the erosion control firm shall coordinate their work schedule with the DWMR project manager. Additionally, the staging area and water supply availability shall be reviewed and agreed upon. D. Hydroseeding: On the coordinated day, the erosion control firm shall mobilize to the KLF with materials and equipment. The crew foreman shall meet with the DWMR project manager to review the application areas and conduct a drive-around to confirm access to the hydroseeding areas. Question Submission Deadline: July 24, 2023, 2:00pm A. Location #1: Kiefer Landfill Sacramento County DWMR (Department of Waste Management and Recycling) 12701 Kiefer Blvd Sloughhouse, CA 95683 B. Location #2: Elk Grove Landfill Sacramento County DWMR Southwest of the intersection of Bond Road and Waterman Road

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects