Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 24, 2023

August 22, 2023

November 11, 2024

58 Conomo Ave

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

58 Conomo Ave, East Lynn, MA

Subscribe to View Full Documents

Renovations of the HVAC system within the Sisson Elementary School. Equipment, piping and controls are to be replaced for a fully functional HVAC system for the school. In addition, there are ADA renovations which add a LULA lift and an ADA compliant Toilet room within the existing building. QUESTIONS: All questions must be submitted in writing by email only, addressed to the Authority's Architect: Raymond Design Associates, Inc. Attn: John Bartecchi Email: jbartecchi@rda-design.com Questions must be received by the RDA no later than 4:00 PM on July 19, 2023. Responses to questions will be provided by 2:00 PM on July 20, 2023. PROJECT DESCRIPTION A. Work covered by Contract Documents: The project consists of the removal and replacement of the HVAC system within the existing 2 story Classroom Wing, Cafeteria and Gymnasium. New Boiler Room and Rooftop Equipment will be required. There is an ADA compliance scope item to install a LULA lift for access to the upper level and an ADA accessible Toilet Room. The City is contracting for the abatement of hazardous materials within the interior of the building through outside contractors prior to and in conjunction with this project timeline. Hazardous material abatement at new and modified existing mechanical penetrations are the scope of this contract. 1. Project Address: Sisson Elementary School 58 Conomo Ave Lynn, MA 01905 2. Work included beyond the Contract Limits: The site is within a residential urban neighborhood. Site access, trucking routing and non-interruption of street logistics co-ordination and plan submittal is paramount in the execution of this contract 3. Completeness: The Work shall be as shown on the Drawings and be complete in every respect and in conformance with all applicable requirements of the governing laws and codes. B. Contract time: The Construction Manager may begin on-site work on, or after receipt of a written Notice to Proceed, or suitable Letter of Intent. After commencement of work, the Contractor shall pursue the Work continuously and with diligence, and bring the occupied portions of the renovations to substantial completion prior to start of school year 2024 and have the heating plant on line and commissioned prior to Oct 1, 2024. 1. Project will be available to the Contractor on August 7, 2023. 2. The submittal and ordering of equipment is paramount to the schedule. It is anticipated that the bulk of the work will be performed on 2 nd shift and during vacations. The school will remain occupied throughout the school year 2023/2024. 3. Liquidated Damages are to assessed at $1,500 / Calendar Day beyond the 2024 school opening and/or the October 1 st , commissioning deadline. Bid Results :: 04 20 00.FSB Masonry :: The Waterproofing Company :: $28,500.00 09 50 00.FSB Acoustical Tile :: Cheviot Corporation :: $114,992.00 22 00 00.FSB Plumbing :: E. Amanti & Sons, Inc :: $98,000.00 26 00 00.FSB Electrical Work :: Your Electrical Solution, :: $237,500.00

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.