Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 20, 2023

August 21, 2023

May 30, 2024

4919 51 St

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

4919 51 St, Rocky Mountain House, AB

Subscribe to View Full Documents

Work of this Contract comprises the following: .1 The removal of existing 'Delta' control system including all system hardware and infrastructure in its entirety .2 The removal and replacement of all existing VAV boxes with new .3 Removal and replacement of all existing heating control valves .4 Removal and replacement of all existing thermostats .5 Provide new DDC BMCS system to control air handling units, all existing BMCS controlled systems, new VAV boxes, new heating control valves (perimeter heating and VAV reheat coils) .6 Provide power as required to suit new controls .7 Provide new air and water balancing to all supply air diffusers and VAV boxes .8 Remove compressor and all existing pneumatics Bid values are undisclosed.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects