Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 29, 2023

September 28, 2023

September 30, 2024

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Providence, RI

Subscribe to View Full Documents

The Rhode Island Public Transit Authority is seeking proposals for the rehabilitation of the East Side Tunnel between Thayer Street on the East and North Main Street on the West. The project includes, but is not limited to, the following. o Obtain all required state permitsb o Remove defective concrete on the tunnel walls and arch and replace with new concrete o Remove deficient tunnel lighting system and replace with a new system o Replace the incoming electrical service with a new service including all electrical equipment inside the electrical room abutting the West end of the tunnel o Repair portal facades o Repair electrical room walls and ceiling place a new concrete floor slab o Abandon existing roadway drainage system and replace with new drainage system o Remove electrical room wood door and frame and install metal door and frame o Close off electrical splice chambers in tunnel o Replace asphalt in tunnel and approaches o Line striping o Replace drainage downspouts o Install a new tunnel fire standpipe system o Refurbish the historic bus shelter and replace the missing column o Reconnect the drain gutters to underground drain pipe Request for Approved equals and Questions must be submitted ELECTRONICALLY IN MICROSOFT WORD FORMAT to RIPTA Contracts Manager by July 20, 2023 1:00 p.m. Eastern Time. RIPTA reserves the right to reject any and all Proposals. The right is reserved to reject any or all Proposals, and to waive technical defects as the interest of RIPTA may require. Each Proposer shall be notified if all Proposals are rejected. Substantial Completion September 24, 2024 Liquidated Damages will be assessed at the rate of $6000.00 per calendar day after the agreed upon projects Substantial Completion date. A Proposal Guarantee (if required) shall be submitted with the Proposal response. This guarantee shall be equivalent to five (5) percent of the Proposal price. Performance and Payment Bonds in the amount of 100% of the Proposal amount covering the faithful performance of the contract.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects