Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 14, 2023

September 13, 2023

September 28, 2023

308 3rd St

Renovation

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

308 3rd St, Corpus Christi, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project: Advanced Corrosion Control Facility (ACCF) Pit Lining at the Corpus Christi Army Depot (CCAD) In accordance with FAR 36.204 Disclosure of magnitude of construction project: Between $100,000 and $250,000. This is a total small business set aside.Firm Fixed Price (FFP) contract will be awarded to the responsible contractor with the lowest priced technically acceptable offer. A site visit is scheduled for Tuesday, 25 July 2023 at 9:00 AM CDT at the Corpus Christi Army Depot. This will be the only site visit scheduled. Inform the primary point of contact listed in the solicitation by 3:00 PM CDT, 21 July 2023, if interested in attending. Attendance is not mandatory to submit an offer. Submission Requirements: Contractors must submit a capability statement and information about the chemical resistant lining to be used in order to be determined technically acceptable. All questions are to be submitted to both the Contract Specialist and Contracting Officer listed in the solicitation by 3:00 PM CDT, 1 August 2023. Due Date: Contractors must submit offers by 3:00 PM CDT, 14 August 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.