Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
January 20, 2024
No Information to Display
Multiple Locations
Paving, Site Work
No Information to Display
$1,316,264.00
Public - City
Multiple Locations, Centerville, OH
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The services include preparation of a formal feasibility study and construction contract plans for the installation of a 10' asphalt bike path along Clyo Road and East Franklin Road. The proposed bike path on the east side of Clyo Road will go from East Alex-Bell Road to East Franklin Street, will be approximately 5,600 feet (1.06 miles) in length, and will replace an existing 5' concrete sidewalk. The project will upgrade the intersections with Americans with Disabilities Act (ADA) pads that align with the proposed bike path. There will also be trees planted along the City-owned property between Millerton Drive and Centerville Station Road. The proposed bike path on the south side of East Franklin Road will go from North Johanna Drive to Clyo Road, will be approximately 2,800 feet (0.53 miles) in length, and will replace an existing 5' concrete sidewalk. The project will upgrade the intersections with ADA pads that align with the proposed bike path. This hiker biker extension will connect to existing hiker biker trails on Alex-Bell Road, Centerville Station Road, Clyo Road, and Bike Route 12. The initial consulting agreement will include preliminary engineering, environmental services, and construction plans. Right of Way Acquisitions Services may be required and will be determined at a later date. Prequalification requirements for this agreement are listed below. For all prequalification categories other than FINANCIAL MANAGEMENT SYSTEM EVALUATION the requirement may be met by the prime consultant or a subconsultant. Also, please note that only individuals (not firms) are prequalified for right of way acquisition services. In instances where prequalification for these services is required, a prequalified individual, either employed by the prime consultant or a subconsultant, must be named in order to meet the requirement. For agreements that require prequalification in FINANCIAL MANAGEMENT SYSTEM EVALUATION, the prime consultant and all subconsultants that provide engineering and design related services must be prequalified in this category. Engineering and Design Related Services are defined as follows: Program management, construction management, feasibility studies, preliminary engineering, design engineering, surveying, mapping, or architectural related services with respect to a highway construction project subject to 23 U.S.C. 112(a) as defined in 23 U.S.C 112(b)(2)(A); and Professional services of an architectural or engineering nature, as defined by State law (ORC 5526), which are required to or may logically or justifiably be performed or approved by a person licensed, registered, or certified to provide the services with respect to a highway construction project to 23 U.S.C. 112(a) and defined in 40 U.S.C. 1102(2). Estimated Construction Cost: $1,316,264 It is anticipated that the selected Consultant will be authorized to proceed in August 2023. The method of Contractor Selection has not been Determined at this time.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Centerville, OH
Bid Date: Apr 15 2021
Centerville, OH
Bid Date: Apr 15 2021
Centerville, OH
Bid Date: Jan 27 2022
Centerville, OH
Bid Date: Apr 15 2021
Centerville, OH
Bid Date: Apr 15 2021
Centerville, OH
Bid Date: Apr 15 2021
Centerville, OH
Bid Date: Jan 27 2022
Centerville, OH
Bid Date: Mar 10 2022
Centerville, OH
Bid Date: Sep 06 2023
Centerville, OH
Bid Date: Sep 26 2023
Centerville, OH
Bid Date: Sep 07 2023
Centerville, OH
--
Centerville, OH
Bid Date: Sep 06 2023
East Liverpool, OH
Bid Date: Jul 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
