Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

December 25, 2023

May 11, 2025

723 S Lewis St

Site Work

No Information to Display

$13,500,000.00

Public - City

img_map_placeholder

723 S Lewis St, Stillwater, OK

Subscribe to View Full Documents

The prequalification for this bid has closed. Only bidders who are determined by the City to be prequalified are eligible to submit a response and have been invited to bid. Project No: 2021.040, 22469 Block 34 Park Improvements Project Based on the information provided, we understand the project will consist of replacing the existing failing pavement on the following streets. West 8th Avenue from Duncan to Husband Streets South Duncan Street from West 8th Avenue to West 9th Avenue Install 1,400 square yards of sod, 8,100 square yards of pavement, 3,620 linear feet of concrete curb and gutter, 260 square yards of textured and colored crosswalk, 950 square yards of concrete sidewalk, 520 square feet of ODOT Type B tactile warning device, 15 retractable bollards, 100 square feet of aluminum signs with posts, 3,255 linear feet of 4" wide white traffic stripe, 2,283 linear feet of 24" wide white traffic stripe, 9 white traffic stripe symbols, 175 linear feet of 6" PVC pipe, 75 linear feet of 4" PVC pipe, 65 linear feet of 3" PVC pipe, 300 linear feet of 2" PVC pipe, 147 linear feet of 12" PVC C900 DR 18 pipe, 530 linear feet of 8" PVC C900 DR 18 pipe, 7 gate valves, miscellaneous pipe fittings, 9 meter assemblies, new light poles and luminaires, and miscellaneous site work, clearing, and grading. (Quantities will vary.) Question Deadline: 10/18/2023 05:00 PM (CT)

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects