Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

October 5, 2023

April 15, 2024

Multiple Locations

Renovation, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Redwood City, CA

Subscribe to View Full Documents

The work for this project will generally consist of furnishing labor, equipment, materials, and incidentals for the improvements of the two (2) existing sanitary sewer pump stations, including site preparation, construction support arrangements, demolition, pump station modifications, new pump station equipment, replacements/retrofits, system upgrades, traffic control, temporary flow bypass systems, and the forcemain improvements. The work includes, but is not limited to: removal and replacement of existing mechanical and electrical structures as shown in the drawings; furnishing, installation and operation of temporary bypass system; rehabilitation and repair of existing wet well and installation of new protective polyurethane coating; furnishing and installation of 5-HP submersible pumps and pump accessories, pump mounting brackets, wet well hatch and safety grate, wet well blower and vent stack; pipes, fittings, valves, flow meter, couplings, adapters, pipe supports, valve vault with access hatch, and air release valve vault; furnishing and installation of mechanical and electrical control equipment, furnishing and installation of a new generator with automatic transfer switch and other appurtenances; provision wall penetrations; furnishing and installation of 1-inch water pipelines and appurtenances; furnishing and installation of motor control center (MCC); variable frequency drive (VFD), programmable logic controller (PLC); field verification of existing forcemain and existing utilities, installation of forcemain pipes, fittings, couplings, adapters, and restraints; removal and disposal of the existing asbestos cement pipe; start-up and testing of mechanical and electrical structures and equipment; saw-cutting; pavement removal and trenching; sheeting; shoring and bracing; dewatering; backfill; controlled density fill; base compaction; AC pavement restoration; landscape restoration including but not limited to grass lawn, plants, etc., asphalt pavement restoration; fence restoration and replacement; concrete pad installation; connection work; disposal of unsuitable materials; new PG&E service connection and associated work; vehicular and pedestrian safety and convenience; dust alleviation, storm water pollution prevention, and daily site cleanup and other related work.

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.