Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

April 18, 2024

34 W State St

Renovation, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

34 W State St, Niles, OH

Subscribe to View Full Documents

The work covered by the Contract Documents includes the following: Supply all material, labor, equipment, and all supplies necessary to construct all items indicated in the plans and specification for installation of the following: removal and reconfiguration of electrical equipment, removal of concrete pads, trenching, new conduits, primary cabling, riser pole modifications, structure modifications, and grounding All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer, Ed Sullivan, Quad3 Group Inc., 3495 Butler St., Pittsburgh, PA 15201 or via email at esullivan@quad3.com. Include the project title in the email subject line. Telephone inquiries will not be accepted. Detailed requirements of the work are described on the pertinent specification sections and/or shown on the drawings. All labor, supervision, materials (poles, conductor, cable, hardware, etc,), equipment (line trucks, cable pulling apparatus, temporary arms, boots, tools, etc.), and miscellaneous comsumables (tape, rope, etc.) shall be provided by the Contractor. The work for this project consists of, but is not limited to the following: 1) Demolition of existing substation equipment (power transformer, switchgeaer, structure, etc.) and cabling. 2) Reconfiguration and connection of existing spare, 5kV metal-clad outdoor switchgear unit. 3) Modification of structure bus. 4) Construction of new 4.16kV main cable connection to 5kV switchgear unit. 5) Construction of (2) new 4.16kV feeder cable risers. 6) Replacement of aerial feeder crossarms assemblies to accommodate new feeders. 7) Provide 48VDC battery system for switchgear breaker control power.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects