Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 14, 2023

August 14, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Wentzville, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Request for Additional Information/Questions Date: July 12 at 11:00AM CST GENERAL SCOPE 1. The purpose of this Request for Bid (RFB) is to establish a contract for the installation of engineered wood fiber on four (4) elementary schools for a total of seven (7) playgrounds for the Wentzville School District. 2. The installation of engineered wood fiber in two (2) playgrounds at Heritage Elementary, two (2) playgrounds at Boone Trail Elementary, two (2) playgrounds at Crossroads Elementary, one (1) playground at Green Tree Elementary shall be.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects