Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 6, 2023
November 5, 2023
No Information to Display
To Be Determined
Paving, Site Work
No Information to Display
No Information to Display
Public - County
To Be Determined, Pensacola, FL
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Oak Valley Bridge Replacement FEMA Project. The existing cross drain (2-48" RCP pipes) will be removed and replaced with a "Conspan ALBC #87" Bridge Structure to re-establish the design flow capacity and reduce the potential for future overtopping and flooding during storm events. To repair/upgrade the system, it will be necessary to remove the cross drain system and replace it with the aforementioned bridge structure, regrade/stabilize the upstream and downstream areas within the right-of-way, remove and replace the roadway, guardrail, curb inlets, storm sewer piping, waterline, gas line, and inspect in-place storm sewer for damage. In addition to the new bridge structure, articulated concrete block will be put in place on the upstream and downstream sides of the bridge to prevent scour in the future. Question Submission Deadline:July 18, 2023, 3:00pm Escambia County Business License General or Marine Specialty State Contractors License Underground Utilities License as applicable. All bids will remain subject to acceptance or rejection by Escambia County for ninety (90) calendar days after the day of the bid opening. The County may, in its sole discretion, release any bid and return the bid security prior to the end of this period. Escambia County specifically reserves the right to reject any conditional or incomplete bid. The County reserves the right to add or delete any item(s) from this bid or resulting contract when deemed to be in the County's best interest. Work Zone Safety Traffic Supervisor Certifications as applicable. The County reserves the right to waive informalities in bids to reject any or all bids with or without cause and accept the bid that in its judgment is in the best interest of the County. The entire project shall be completed in the time frame specified in the scope of work. The date of substantial completion of the work or designated portion thereof is the date certified by the Engineer when construction is sufficiently complete and approved in accordance with the Contract Documents so the County can occupy or utilize the work for the use which it was intended. The date of substantial completion of the work or designated portion thereof is the date certified by the Engineer when construction is sufficiently complete and approved in accordance with the Contract Documents so the County can occupy or utilize the work for the use which it was intended.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Pensacola, FL
Bid Date: Aug 08 2023
Pensacola, FL
Bid Date: Aug 04 2023
Pensacola, FL
Bid Date: Aug 16 2023
Pensacola, FL
Bid Date: Aug 16 2023
Pensacola, FL
Bid Date: Aug 02 2023
Pensacola, FL
Bid Date: Aug 11 2023
Pensacola, FL
--
Pensacola, FL
Bid Date: Aug 16 2023
Pensacola, FL
--
Deltona, FL
Bid Date: Aug 24 2023
Pensacola, FL
--
Weston, FL
Bid Date: Aug 15 2023
Weston, FL
Bid Date: Aug 04 2023
Miami, FL
Bid Date: Aug 04 2023
Vero Beach, FL
Bid Date: Aug 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
