Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 19, 2023

September 18, 2023

March 18, 2024

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$4,100,000.00

Public - City

img_map_placeholder

Multiple Locations, Seattle, WA

Subscribe to View Full Documents

Project Location: Thomas Street between 5th Ave N and Dexter Ave N, and Taylor Ave N between Thomas Street and Harrison Street. Construct bicycle, pedestrian, drainage, and traffic signal improvements including a widened sidewalk and bicycle zone on the north side of Thomas Street, a protected intersection at Thomas Street and Dexter Avenue, new curb ramps, sidewalk, pavement repair, bicycle signals, pedestrian lighting and new signal poles. For the purpose of the Bidder/Subcontractor list, this project includes electrical work and rebar installation. Clarification Deadline: 7/14/2023 5:00 PM There is no pre-bid site inspection meeting scheduled for this project. The Bidder has attached a Bid Guaranty in the amount of five percent (5%) of the Total Bid including retail sales tax in the form of cashier's check, certified check, or Bid bond All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. Work must begin immediately on the Notice To Proceed Date in the Written Notice from the Engineer and after the date of such notice must be physically completed within the following period per Section 3 of the Agreement: 130 Working Days If the successful Contractor fails to complete Work within the time set forth above, (s)he will be charged Liquidated Damages per Section 4 of the Agreement and Section 1-08.9. See Section 1-08.9 for method for determining cost of liquidated damages. A/E Estimate: $3,700,000 to $4,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

37 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.