Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

August 30, 2023

May 31, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Salina, KS

Subscribe to View Full Documents

Any questions regarding the specifications or the bidding process are to be addressed to Saline County Engineer's office at the emails shown above or at (785) 826-6527. No Pre-Bid Conference Available Bid Bonds used when bid security is required to ensure that the firm or individual awarded a contract will subsequently enter into contract with the County. Performance bond: A contract bond to Saline County, in an amount equal to 100 percent (100%) of the Contract price. Statutory Payment Bond: A payment bond to Saline County in an amount equal to 100 percent (100%) of the Contract price. The Contractor shall file the Statutory Payment Bond at the office of the Clerk of the District Court. The Contractor will commence the work required by the Contract Documents no earlier than the date of the executed contract and will complete all projects by May 31, 2024 (Completion Date). In the event the Contractor fails to complete this work on or before the dates herein established, Saline County shall be entitled to liquidated damages of $200.00 for each day the work goes uncompleted. The County reserves the right to reject any and all bids and to waive technicalities. Saline County shall make the decision as to what constitutes a technicality. No bid may be withdrawn after opening time for a period of 90 days. Late bids will be rejected. Work shall consist of rehabilitating crossroad pipes at various location in Saline County by installing a pipe liner as shown in the construction plans.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.