Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 14, 2023

October 1, 2024

SW Reservoir Dr

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

SW Reservoir Dr, Redmond, OR

Subscribe to View Full Documents

Scope of Work: Scope of Work: The SW Reservoir Drive Improvements include the installation or replacement of pavement, curb, sidewalk, waterline, storm collection, and sewer line between SW 39th Street and Helmholtz Avenue on Reservoir Drive/Wickiup Avenue. There are additional miscellaneous storm water improvement projects between SW 32nd Street and SW 43rd Street. Completion: The project is to be started by September 14, 2023, and completed by October 1, 2024. Enclose a bidder s bond, certified check (or cashier s) check made payable to the Owner in an amount equal to 5% of the total bid. Project Contact: All design questions and clarification inquiries shall be Made in Writing to: Steve Wilson, Project Manager Email: Steve.Wilson@ci.redmond.or.us Steve Wilson, Project Manager City of Redmond Engineering Department 243 E Antler Avenue Redmond, OR 97756 PHONE: (541) 504-2007 FAX: (541) 548-0253 All questions will be responded to in a written Addendum and posted on the www.ciplist.com website. All questions received after this date will not receive a response Scope of Work: The SW Reservoir Drive Improvements include the installation or replacement of pavement, curb, sidewalk, waterline, storm collection and sewer line between SW 39 th Street and Helmholtz Avenue on Reservoir Drive/Wickiup Avenue. Additional miscellaneous stormwater improvement projects exist between SW 32 nd Street and SW 43 rd Street. The City estimates the cost of improvements at $6,000,000 It is the intention of the City to award the Project at the August 22, 2023, City Council meeting. a performance bond in a sum equal to the Contract Price, and a separate payment bond also in a sum equal to the Contract Price. No Pre-bid meeting is proposed.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.