Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 14, 2023

August 14, 2023

May 20, 2024

To Be Determined

Renovation

No Information to Display

$200,000.00

Public - Federal

img_map_placeholder

To Be Determined, Anse-Bleue, NB

Subscribe to View Full Documents

The work covered under this project at Anse-Bleue Harbour located in New-Brunswick, consists of the furnishing of all plant, labour, equipment and material for the electrical system upgrade. The work consists of but is not necessarily limited to the following; removal and disposal of all existing electrical equipment to accommodate the work unless indicated otherwise, arrange and pay allowance for NB Power to provide new service entrance in new electrical building as outlined on drawings and all other associated cost, complete construction of electrical building c/w electrical services and all devices and equipment, supply and install all underground trenching, wire and conduit, supply and install service to poles, shrouds and receptacles complete with associated equipment, new wood poles to replace those in poor condition, removal of existing wood poles and addition of new wood poles to correct excessive spans, new overhead wiring, new exterior lighting to replace and augment the existing NB Power owned fixtures, existing fixtures to be turned over to NB Power, new metal poles and lighting for approach to boat ramp, gangway, and for future gangway, wire and conduit, extend existing conduits as required, provide test and commissioning of all systems, existing electrical wires on wheel guard to be removed and turn over to the Administration Portuaire d'Anse-Bleue. Contract includes mobilization and demobilization all equipment necessary to make work progress for the entire contract, including environmental controls and all associated items in strict accordance with specifications and accompanying drawings and subject to all terms and condition of this contract. Interim certificate (substantial completion) within 200 consecutive working days of award of contact date. Bid value not released for publication.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects