Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 23, 2023
November 22, 2023
May 20, 2024
4004 Arkona Rd
Renovation
No Information to Display
$80,000.00
Public - Federal
4004 Arkona Rd, Milan, MI
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The selected contractor shall provide all materials, labor, and equipment for the project titled Replace Transformer & Load Break at the Federal Correctional Complex (FCI) Milan located in Milan, Michigan in accordance with the attached Statement of Work and Drawings. All work shall be completed per NEC 2020, NESC, and Bureau of Prison Technical Design Guidelines. o All equipment and wire shall be at least 15 KV rated. o All conduit besides underground shall be RMC with watertight fittings o All conductors shall be copper o Fuses: Provide six of each type and rating used. Include spares for fusible devices. Fuses shall match type installed and be packaged with protective covering for storage and identified with labels describing contents. o Provide a strip heater in each switch and switchgear, and a dedicated power circuit for the heater. o The medium voltage switches shall be manually operated and rated at 600-to-1200-amp continuous load break with required fault ratings. The switch mechanism shall provide quick closing and opening independent of the handle speed. The switch shall be cable connected to the transformer to prevent sound transmission to the switch. o Three (3) current limiting fuses are to be provided on the load side of the medium voltage switch in the medium voltage switch compartment. Provide the following interlocking capabilities: -The hinged access door shall be interlocked with the switch to prevent closing of the switch until the door is closed. -Key interlock the access to the fuse such that both switches must be opened before fuses can be accessed. -The following accessories are to be provided: -Terminal compartment. -Lightning arrestor. -Interlocks. -Potheads/Clamp terminals. Deadline 10/04/2023 at 12:00 PM ET 15B41723Q00000029
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Marshall, MI
Bid Date: Oct 27 2023
Reed City, MI
Bid Date: Oct 19 2023
Beverly Hills, MI
Bid Date: Oct 25 2023
Felch Township, MI
Bid Date: Oct 25 2023
Wixom, MI
Bid Date: Aug 05 2025
Ithaca, MI
Bid Date: Oct 24 2023
Farmington Hills, MI
Bid Date: Nov 28 2023
Midland, MI
Bid Date: Oct 31 2023
Beulah, MI
Bid Date: Oct 27 2023
Kalamazoo, MI
Bid Date: Nov 02 2023
Detroit, MI
Bid Date: Nov 01 2023
Grand Rapids, MI
Bid Date: Nov 21 2023
Inkster, MI
Bid Date: Nov 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
