Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 1, 2023

September 30, 2024

M.L.K. Jr Blvd

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

M.L.K. Jr Blvd, Clovis, NM

Subscribe to View Full Documents

Reference Number 0000324192 The Project includes the following Work: This project includes the reconstruction of Dr. Martin Luther King, Jr. Blvd. beginning at the north sideline of 7 th Street and north approximately 5,247.06 feet (0.99 miles) to approximately 66 feet south of the intersection with W. 21 st Street at existing PCCP. Roadway improvements for this project includes, but are not limited to: - 5,247.06 feet (0.99 miles) of roadway reconstruction, which includes the replacement of the existing pavement and base course with 5 inches of HMA SP IV over 10 inches of base course, in addition to lime treated subgrade as part of the subgrade preparation. - Permanent signing and striping improvements throughout the entire project length. - Driveway and side road connections. - The installation of new concrete curb and gutter. - The construction of new ADA-compliant sidewalks adjacent to both sides of the roadway-the replacement of existing traffic signals at both the 7 th Street and 21st Street intersections, including the replacement of the existing school flashers with new flasher systems at the northbound and southbound approach to Cesar Chavez. - The installation / resetting of current street lighting. - Drainage improvements for this project will include the construction of a new concrete lined channel to replace the existing Worthington ditch, which is located adjacent to the roadway, and the installation of sidewalk culverts along the west side of Dr. Martin Luther King, Jr. Blvd. This project will also include the replacement / relocation of existing roadway drainage facilities throughout the project limits. - Utility improvements for this project will include the adjustment and/or relocation of both public and private utilities. Question Deadline 07/27/2023 at 5:00 PM MT Questions are submitted online Yes

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.