Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2023

August 17, 2023

February 28, 2024

To Be Determined

Site Work

No Information to Display

$333,430.00

Public - City

img_map_placeholder

To Be Determined, Elton, LA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Removing existing water meters and replacing with radio frequency meters and implementing a Radio Based Automated Water Meter Reading (AMR) System For additional sets of documents and for documents issued to subcontractors or material suppliers, the cost of reproduction and mailing of each set will be deducted and a balance of $50.00 refunded. Said refunds will only be made for a complete set of documents in good condition returned within 10 days following bid opening. Partial sets of documents will not be issued.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects