Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 27, 2023

September 25, 2023

September 9, 2024

Multiple Locations

Renovation, Site Work

No Information to Display

$2,600,000.00

Public - City

img_map_placeholder

Multiple Locations, Coppell, TX

Subscribe to View Full Documents

As of 8/22/2023, this project has been put on hold by the department. A timeline for award was not determined. Q & A deadline: Jul 21, 2023 5:00:00 PM CT This work will consist of the construction of emergency bypass pumping system including suction and discharge connections, 671 LF of 36-inch discharge pipeline including fittings, connection to existing 30-inch and 16-inch water mains in Kimbel Kourt, temporary 36-inch and 48- inch line stops to facilitate the work, pump staging area with concrete pavement, the installation of meter and vault on existing 24-inch water main, the installation of plug valve and vault on the existing 36" water main located below the floor within the existing pump station building, 48-inch and 36-inch gate valves to replace existing valves, yard piping, underground electrical conduit repair including temporary service, 8' black vinyl coated fence replacement, irrigation repair and erosion control, and all appurtenant work as laid out and described in the construction plans. The work will be phased such that the bypass pipelines are to be completely tested and in service before valve replacement can begin, including temporary bypass pumps for the duration of the valve replacement work. Work shall include all components necessary for the "turnkey" construction of the project and related improvements as shown in the plans for Project No. WA 20-02.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.