Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
July 19, 2023
October 1, 2023
December 31, 2024
Multiple Locations
Renovation
No Information to Display
$1,240,000.00
Public - City
Multiple Locations, Trenton, MI
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1. Provide a summary table listing all design build project projected outcomes. Refer to Exhibit A, "Potential Scope" for categories of energy conservation measures to incorporate in your response. The summary table shall include the following for each measure individually. A separate table shall be included for any proposed alternatives. a. The cost of each measure, including all design, labor and material costs for the same b. Annual net energy savings c. Annual net operational savings d. Any applicable utility rebates e. Calculated simple payback 2. Identify and describe all proposed energy conservation measures listed in the table above. Provide a detailed description of scope of the work to be performed for each outcome, including quantities, sizes, capacities, etc., as applicable. Also clearly indicate any related items or existing equipment that is to remain. 3. Provide in table form, a detailed breakdown of the energy performance savings to be derived for each energy conservation measure, including the following: Annual guaranteed electrical, natural gas, water, and/or other utility savings. Both usage savings and the calculated monetary value of those savings shall be listed. Guaranteed energy savings and operating and maintenance costs savings resulting from each energy conservation measure and the Project as a whole. Totals should match those listed in the summary table above. 4. Describe the engineering methodology and calculations used for each of the proposed energy savings measures. Also provide detailed calculations to substantiate any proposed operating and maintenance cost savings. 5. If the Bidder proposes a maintenance program, provide detailed information regarding the annual costs, scope of services provided, and terms of contract. 6. Provide a table identifying a summary of all warranties by equipment type, including manufacturer's warranty coverage and duration that may exceed the overall Project warranty term. Identify whether the product may qualify under the Buy America Act. 7. Provide a Project schedule for implementation of the stated scope of work. The District intends to select the most qualified Bidder per the evaluation criteria herein with whom it will enter into an Energy Conservation Performance Contract, although the District reserves the right to reject any or all bids. Please submit two (2) paper copies and one (1) electronic copy of responses completed according to the format prescribed by the RFP. After review of all accepted responses, bidders selected on the basis of their responses may be invited to participate in an on-site interview. Final selection will be made in accordance with the policies and administrative directive of the District and other applicable statutory provisions. All questions concerning this request including general information, instructions, and selection criteria shall be submitted via email to: Gail Farrell Chief Financial Officer Trenton Public Schools farrellg@trentonschools.com. Last Day to Submit Written Questions July 17, 2023 12:00 pm A. HVAC System Modifications & Upgrades B. Web-Based Building Automation System C. Lighting-All LED fixtures shall be by major tier 1 manufacturers with ten (10) years LED lighting experience, 30 years lighting experience, and shall be UL listed, FCC compliant, and DLC Qualified or Energy Star Certified. All manufacturers shall be headquartered with offices in North America or Europe. All lighting parts shall include industry standard warranties. D. Fenestration Improvements and Entrance/Exit Closures E. Water Conservation F. Building Envelope G. Solar Energy Generation H. Student Interactive Educational Supplemental Curriculum I. Other ECMs Improvements as recommended by the Vendor All Overhead Costs incurred by the successful Vender shall be included in its proposed Contract Price, unless otherwise specified in its proposal.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Trenton, MI
Bid Date: Nov 03 2023
Trenton, MI
Bid Date: Jan 26 2024
Trenton, MI
Bid Date: Sep 19 2024
Trenton, MI
Bid Date: Sep 06 2023
Otisville, MI
Bid Date: Aug 24 2023
Mesick, MI
Bid Date: Sep 21 2023
Boon, MI
Bid Date: Aug 14 2023
Brighton, MI
Bid Date: Aug 16 2023
Hillsdale, MI
Bid Date: Aug 10 2023
Windsor charter Township, MI
Bid Date: Sep 13 2023
Auburn Hills, MI
Bid Date: Jun 07 2023
Shelby, MI
Bid Date: Sep 07 2023
Mason, MI
Bid Date: Aug 16 2023
Lansing, MI
--
Warren, MI
Bid Date: Aug 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
